Solar project benchmarks
Compare Queensland utility-scale solar projects and their monthly capture prices against the regional spot price and wind peers.
PROJECT-LEVEL DATA
Queensland utility-scale solar project benchmarks
Compare Queensland utility-scale solar projects against the regional spot price and the solar peer benchmark. Find a project by name or DUID and see its rank for each month.
- Data through
- October 2026
- Coverage
- Nov 2025 to Oct 2026
- Source
- AEMO five-minute data
Enable JavaScript to explore the benchmark. The monthly CSV is available above.
Compare project performance
Select up to three projects. Gaps indicate months without qualifying data.
Results by project
| Project | Peer rank | Capture priceA$/MWh | vs QLDA$/MWh | vs solar peersA$/MWh | Negative-price generation% of export | Estimated exportMWh | Generation MLF | Coverage5-min intervals |
|---|
Method and sources
How the metrics are calculated
Five-minute export is estimated from consecutive AEMO SCADA power readings and matched to the Queensland five-minute TRADE regional reference price. Capture price is weighted by each project's estimated exports. The Queensland benchmark is time weighted. The solar peer benchmark divides total spot value by total export across all qualifying projects. The full-period view compares only projects that qualify in every month.
Negative-price exposure is the share of estimated exports at a regional price below zero. Figures show estimated wholesale spot energy before MLF. The displayed MLF is the published generation factor for the selected month. Projects with different factors across units show unit-specific factors in the roster download.
Source files and validation
Each qualifying project has positive estimated export and both SCADA endpoints for every interval across all its selected units. The cohort uses the 4 November 2026 registration list and includes Queensland semi-scheduled solar projects with at least 100 MW of registered generation capacity, grouped by registered station name. The coverage CSV shows why project-months were excluded.
Data attributed to the Australian Energy Market Operator. The export files use fixed AEST (UTC+10) and interval-ending timestamps. The downloadable source register records the original file URLs and SHA-256 checksums.
Download project and MLF roster · Download source register · Download detailed methodology · AEMO SCADA · AEMO loss factors