{"checked_on":"2026-10-03","update_model":"Reviewed historical datasets; updated through new publications","entries":[{"id":"electricity-prices","name":"Electricity monthly spot prices","period":"2005-07 – 2026-09","frequency":"Monthly · AUD/MWh","scope":"1,275 regional-month rows · NSW/ACT, QLD, VIC, SA, TAS","source":"AEMO monthly AVGRRP CSVs","version":"aemo-published-monthly-avgrrp-v1","checked_on":"2026-10-01T04:23:42+00:00","status":"Published fixed snapshot; manual reviewed updates","notes":"Published time-weighted monthly regional averages. Complete months only; fixed AEST. Not retail prices or project capture prices.","method":"/#methods","download":"/api/download/prices.csv?region=all&from=2005-07&to=2026-09"},{"id":"mlf","name":"Transmission loss factors (MLF)","period":"FY 2025–26 / FY 2026–27","frequency":"Annual factor · dimensionless","scope":"590 DUIDs; 1312 direction/year records","source":"AEMO FY2026–27 report, v3","version":"v3 · released 2026-07-22","checked_on":"2026-10-02","status":"Published fixed snapshot; manual reviewed updates","notes":"FY2025–26 is the report’s comparison column, not a complete history of factors applied throughout that year. Generation and bidirectional tables only; separate load TNI tables excluded. DUIDs are not physical-site counts. Technology labels are editorial; uncertain and other types remain separate.","method":"/#methods","download":"/data/mlf.csv"},{"id":"distribution-loss-factors","name":"Distribution loss factors (DLF)","period":"FY 2025–26 / FY 2026–27","frequency":"Annual factor · dimensionless","scope":"1191 source rows: FY2025–26 585, FY2026–27 606; 12 blank/text factors retained","source":"User-supplied copies of official AEMO DLF workbooks","version":"FY 2026–27 · Workbook version 1; FY 2025–26 · Uploaded workbook; no version-control sheet","checked_on":"2026-10-02","status":"Published fixed snapshot; manual reviewed updates","notes":"Each financial year uses its own workbook’s DLF-to-apply column; comparison columns do not replace the prior-year dataset. All 1,191 source data rows retained, including 12 blank/text factors. Source rows are not unique sites or generators. Network/class and site-specific records remain distinct. Full stored precision retained; seven external-formula cells use published cached results without recalculation. Checksums identify uploaded bytes, not a fresh server download or latest-revision verification. FY2026–27 workbook date 1 April 2026 and listing date 31 March 2026 are separate.","method":"/#explore","download":"/data/dlf.csv"},{"id":"renewable-generation","name":"Renewable output and generation shares","period":"2025-Q1 – 2026-Q2","frequency":"Quarterly · MW, estimated GWh and %","scope":"NEM overall · 18 technology-quarter rows; 6 quarter summaries","source":"AEMO Quarterly Energy Dynamics (QED)","version":"qed-green-v2","checked_on":"2026-10-02T03:06:33.597Z","status":"Published fixed snapshot; manual reviewed updates","notes":"Six quarters from four reports. Some prior-year MW values are derived from published year-on-year differences. GWh is estimated from rounded MW; generation-share denominators differ by report vintage. Not state-level generation or installed capacity.","method":"/methods/green-energy","download":"/data/metrics/green-generation.csv"},{"id":"captured-prices","name":"Wind and grid-scale solar captured prices","period":"2025-Q1 – 2026-Q2","frequency":"Quarterly · AUD/MWh","scope":"NEM fleet-level · 12 fuel-quarter rows","source":"AEMO QED published fuel-level VWAP figures","version":"qed-green-v2","checked_on":"2026-10-02T03:06:33.597Z","status":"Published fixed snapshot; manual reviewed updates","notes":"Generation-volume-weighted spot prices, not Electricity AVGRRP, a project-specific result, a quoted PPA price or a capture ratio.","method":"/methods/green-energy","download":"/data/metrics/green-capture-prices.csv"},{"id":"negative-prices","name":"Negative-price monthly and daily indicators","period":"2025-10 – 2026-09","frequency":"Five-minute TRADE input; monthly/daily % and hours","scope":"60 regional-month summaries; 1825 regional-day summaries","source":"60 retained AEMO regional PRICE_AND_DEMAND CSVs","version":"negative-time-v1","checked_on":"2026-10-01T23:54:04+00:00","status":"Published fixed snapshot; manual reviewed updates","notes":"Negative interval duration divided by verified duration. Fixed AEST. This is time share, not output-weighted renewable exposure. Shown date is the calculation build date; each original file’s check date and hash are in the source register.","method":"/methods/negative-prices","download":"/data/metrics/negative-history.csv"},{"id":"hourly-profile","name":"Negative-price hour-of-day profile","period":"2025-10 – 2026-09","frequency":"24 hour buckets · %","scope":"120 region/hour rows across five regions","source":"Same retained AEMO interval files as negative-price indicators","version":"negative-hour-v1","checked_on":"2026-10-02T02:05:26+00:00","status":"Published fixed snapshot; manual reviewed updates","notes":"Pooled hour-of-day buckets across the full stated period, not an hourly time series. Interval-start hour, fixed AEST. Its period is independent of the selected generation quarter.","method":"/methods/green-energy","download":"/data/metrics/negative-hourly.csv"},{"id":"ppa-comparison","name":"PPA historical strike-price comparison","period":"2025-Q1 – 2026-Q2","frequency":"Quarterly · AUD/MWh price difference","scope":"NEM fleet-level solar or wind; strike entered by user","source":"Same six-quarter captured-price dataset above","version":"Local comparison: captured price minus input strike","checked_on":"2026-10-02T03:06:33.597Z","status":"Browser calculation; no separate market dataset","notes":"Not contractual settlement, project revenue or a forecast. No volumes, project profile, MLF, certificates or contract terms are modelled.","method":"/methods/green-energy#ppa-method","download":"/data/metrics/ppa-example-solar-60.csv"},{"id":"gas-monthly","name":"Wholesale gas monthly history","period":"Market-specific starts (2007-02 / 2010-09 / 2011-12) – 2026-08","frequency":"Monthly · AUD/GJ","scope":"796 market-month rows · VIC DWGM and three STTM hubs","source":"Retained user-uploaded AEMO DWGM/STTM historical workbooks","version":"gas-monthly-daily-mean-v1","checked_on":"2026-10-03","status":"Published fixed snapshot; manual reviewed updates","notes":"Victoria · DWGM: 2007-02–2026-08 (235 months); Sydney · STTM: 2010-09–2026-08 (192 months); Adelaide · STTM: 2010-09–2026-08 (192 months); Brisbane · STTM: 2011-12–2026-08 (177 months). VIC: daily 6am beginning-of-day price; STTM: daily ex-ante price. Arithmetic means of complete gas-date months. Not volume-weighted settlement costs, QED monthly estimates or retail bills. No GSH monthly series. Original-byte hashes identify uploaded copies; no fresh server-download verification claimed.","method":"/methods/gas#monthly","download":"/data/gas/monthly/all-markets.csv"},{"id":"gas-prices","name":"Wholesale gas prices","period":"2025-Q1 – 2026-Q2","frequency":"Quarterly · AUD/GJ","scope":"30 market-quarter rows · VIC DWGM, Adelaide/Brisbane/Sydney STTM, GSH","source":"AEMO QED quarterly market comparison tables","version":"gas-qed-v1","checked_on":"2026-10-02","status":"Published fixed snapshot; manual reviewed updates","notes":"Reported quarterly averages. Separate from the monthly workbook-derived series; no independently reconstructed QED weighting. GSH retains the report label; it is not asserted to be Wallumbilla-only. No national aggregate or final retail bill is calculated.","method":"/methods/gas","download":"/data/gas/all-markets.csv"}],"sources":[{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_200606.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_200606.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"597e7519287c4c6d648fc7d39aa1b6b2f0f563b50cfe5a33bc6ca58c4c5049af","hash_note":"Retained original file bytes"},{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_200706.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_200706.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"4c8cbcd8847b1c95175ed68e82705e95cf57ed9690bc0e0505bf7b2a5cc760e1","hash_note":"Retained original file bytes"},{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_200806.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_200806.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"a22c76299600277228762d119e793fc8374747466b0a359072e045c900d09f50","hash_note":"Retained original file bytes"},{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_200906.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_200906.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"4486c28bb11ee8bef5b6e65bbcf162879703469d4f73659a0fd92f188749b3dc","hash_note":"Retained original file bytes"},{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_201006.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_201006.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"5f09324b63a1e6144ab3de30275516e50f9269aaa28397a28aabcaf0864da175","hash_note":"Retained original file bytes"},{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_201106.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_201106.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"e9eb0b60776f3b43bd7a3625ce4e31e811685acc89d2f6e6fbc02dc6be201661","hash_note":"Retained original file bytes"},{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_201206.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_201206.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"a2a739e4fd042c33bd6e1a5d43a051fed7f1503f26192f87491106afade21482","hash_note":"Retained original file bytes"},{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_201306.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_201306.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"e7ebbd8594e2743b5d437531c16e93633e4b376d564e891b62dd89b22323f2eb","hash_note":"Retained original file bytes"},{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_201406.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_201406.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"09f149d52942b1db47ed0f4ef6f2e5572f0123ee2d4161b215f98156ec81cc3a","hash_note":"Retained original file bytes"},{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_201506.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_201506.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"bf73e9d79e9ec7eaaf81f1b868dbfcfaba72a0ad09468cbeb0f408e27b275509","hash_note":"Retained original file bytes"},{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_201606.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_201606.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"3fa3ecc0e1b45e1adb9729e29e4f6627cb2a90d1911f9205aae310a9d4a25173","hash_note":"Retained original file bytes"},{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_201706.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_201706.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"f9d0795e777d07f8c7ebc08b14b43b047c0331384e4f0576ed0de4c9390bdd85","hash_note":"Retained original file bytes"},{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_201806.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_201806.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"337fb5fbb5564f76a24e175e2a2849522197896918a5f03dc79f9a1577d9bffc","hash_note":"Retained original file bytes"},{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_201906.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_201906.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"ad51eca6eaa6ed42fdc8d81b3cbddb3e58a54aae684798a9f56bc8baa95c3241","hash_note":"Retained original file bytes"},{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_202006.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_202006.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"f857c2e1580d4f621db3c7a728559dacae632dc3e374399c2da02471f6fd56fb","hash_note":"Retained original file bytes"},{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_202106.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_202106.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"d369fafa4089b8ff87f51308cf000cff4bf306b93df8778efd66b471e501c2ae","hash_note":"Retained original file bytes"},{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_202206.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_202206.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"bdf09226a8c9c7e66eb74722c7db2efc22b288625aea77c787d83d7e5be5b836","hash_note":"Retained original file bytes"},{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_202306.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_202306.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"80ee6e0b80b38c9369038e92ca8079054ce90a8db57b15201205a868efd69d5a","hash_note":"Retained original file bytes"},{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_202406.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_202406.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"4855453e81fbd3f79d65795aa2b3f165f9ddf570b6c71da00c5318e58aa4bdc9","hash_note":"Retained original file bytes"},{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_202506.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_202506.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"ec774e70cc8bd0355997a2d78f17b78b2a91141fd05abc1e5222795ffec272e0","hash_note":"Retained original file bytes"},{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_202606.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_202606.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"04b810c862a6a81c934c0d45e39387a233045a712e560e816a229e92d0c8085e","hash_note":"Retained original file bytes"},{"dataset":"electricity-prices","title":"WEB_AVERAGE_PRICE_MONTH_202609.csv","url":"https://visualisations.aemo.com.au/aemo/data/nem/averageprices/WEB_AVERAGE_PRICE_MONTH_202609.csv","version":"aemo-published-monthly-avgrrp-v1","publication_date":"","checked_on":"2026-10-01T04:23:42+00:00","original_file_sha256":"c9aec34ab008935a5521436d9d7c6f3a22cf074295b6e19ee3f69cd80b08036e","hash_note":"Retained original file bytes"},{"dataset":"mlf","title":"AEMO FY2026–27 MLF report (includes prior-year comparison)","url":"https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/loss_factors_and_regional_boundaries/2026-27/marginal-loss-factors-for-the-2026-27-financial-year.pdf?rev=a657366ca50c4b1a8220c24a3abaa8fb&sc_lang=en","version":"v3","publication_date":"2026-07-22","checked_on":"2026-10-02","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"mlf-classification","title":"Solar — Explicit solar/PV name in MLF report","url":"https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/loss_factors_and_regional_boundaries/2026-27/marginal-loss-factors-for-the-2026-27-financial-year.pdf?rev=a657366ca50c4b1a8220c24a3abaa8fb&sc_lang=en","version":"Editorial grouping; see record evidence","publication_date":"","checked_on":"2026-10-02","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"mlf-classification","title":"Gas — Station matched to AEMO gas infrastructure report GPG table; secondary fuels may apply","url":"https://www.aemo.com.au/-/media/files/stakeholder_consultation/consultations/nem-consultations/2025/2025-gas-infrastructure-options-report/final/2025-gas-infrastructure-options-report.pdf?la=en","version":"Editorial grouping; see record evidence","publication_date":"","checked_on":"2026-10-02","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"mlf-classification","title":"Hydro — Station matched to Queensland government hydro asset list","url":"https://statements.qld.gov.au/statements/87964","version":"Editorial grouping; see record evidence","publication_date":"","checked_on":"2026-10-02","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"mlf-classification","title":"Other / Unclassified — Report names diesel or bioenergy; outside the six core technology groups","url":"https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/loss_factors_and_regional_boundaries/2026-27/marginal-loss-factors-for-the-2026-27-financial-year.pdf?rev=a657366ca50c4b1a8220c24a3abaa8fb&sc_lang=en","version":"Editorial grouping; see record evidence","publication_date":"","checked_on":"2026-10-02","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"mlf-classification","title":"Coal — Station matched to AEMO Thermal Audit coal tables","url":"https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/power_system_ops/2025-thermal-audit.pdf?rev=1794604fd1c94e84b8b430eb4f971657&sc_lang=en","version":"Editorial grouping; see record evidence","publication_date":"","checked_on":"2026-10-02","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"mlf-classification","title":"Auxiliary load — Report explicitly labels load/auxiliary consumption","url":"https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/loss_factors_and_regional_boundaries/2026-27/marginal-loss-factors-for-the-2026-27-financial-year.pdf?rev=a657366ca50c4b1a8220c24a3abaa8fb&sc_lang=en","version":"Editorial grouping; see record evidence","publication_date":"","checked_on":"2026-10-02","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"mlf-classification","title":"Wind — Explicit wind name in MLF report","url":"https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/loss_factors_and_regional_boundaries/2026-27/marginal-loss-factors-for-the-2026-27-financial-year.pdf?rev=a657366ca50c4b1a8220c24a3abaa8fb&sc_lang=en","version":"Editorial grouping; see record evidence","publication_date":"","checked_on":"2026-10-02","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"mlf-classification","title":"Other / Unclassified — Technology not confirmed by retained classification evidence","url":"https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/loss_factors_and_regional_boundaries/2026-27/marginal-loss-factors-for-the-2026-27-financial-year.pdf?rev=a657366ca50c4b1a8220c24a3abaa8fb&sc_lang=en","version":"Editorial grouping; see record evidence","publication_date":"","checked_on":"2026-10-02","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"mlf-classification","title":"Storage — Bidirectional battery table or named pumped hydro facility; includes hybrid BDU entries","url":"https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/loss_factors_and_regional_boundaries/2026-27/marginal-loss-factors-for-the-2026-27-financial-year.pdf?rev=a657366ca50c4b1a8220c24a3abaa8fb&sc_lang=en","version":"Editorial grouping; see record evidence","publication_date":"","checked_on":"2026-10-02","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"mlf-classification","title":"Solar — Generation component matched to Neoen asset list; co-located batteries are separate entries","url":"https://australia.neoen.com/en/news/2024/neoen-completes-a-landmark-renewable-energy-portfolio-financing-of-over-au1-1-billion-in-australia/","version":"Editorial grouping; see record evidence","publication_date":"","checked_on":"2026-10-02","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"mlf-classification","title":"Hydro — Station matched to Snowy Scheme hydro asset list","url":"https://www.snowyhydro.com.au/generation/the-snowy-scheme/","version":"Editorial grouping; see record evidence","publication_date":"","checked_on":"2026-10-02","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"mlf-classification","title":"Hydro — Station matched to AGL hydroelectric asset list","url":"https://www.agl.com.au/about-agl/operations/hydroelectric-power-stations","version":"Editorial grouping; see record evidence","publication_date":"","checked_on":"2026-10-02","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"mlf-classification","title":"Interconnector — Report explicitly names Basslink","url":"https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/loss_factors_and_regional_boundaries/2026-27/marginal-loss-factors-for-the-2026-27-financial-year.pdf?rev=a657366ca50c4b1a8220c24a3abaa8fb&sc_lang=en","version":"Editorial grouping; see record evidence","publication_date":"","checked_on":"2026-10-02","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"mlf-classification","title":"Wind — Generation component matched to Neoen asset list; co-located batteries are separate entries","url":"https://australia.neoen.com/en/news/2024/neoen-completes-a-landmark-renewable-energy-portfolio-financing-of-over-au1-1-billion-in-australia/","version":"Editorial grouping; see record evidence","publication_date":"","checked_on":"2026-10-02","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"mlf-classification","title":"Hydro — Explicit hydro name in MLF report","url":"https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/loss_factors_and_regional_boundaries/2026-27/marginal-loss-factors-for-the-2026-27-financial-year.pdf?rev=a657366ca50c4b1a8220c24a3abaa8fb&sc_lang=en","version":"Editorial grouping; see record evidence","publication_date":"","checked_on":"2026-10-02","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"mlf-classification","title":"Hydro — Station matched to Hydro Tasmania hydro schemes","url":"https://www.hydro.com.au/our-energy-system/our-power-stations","version":"Editorial grouping; see record evidence","publication_date":"","checked_on":"2026-10-02","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"mlf-classification","title":"Wind — Station matched to Hydro Tasmania wind asset list","url":"https://www.hydro.com.au/our-energy-system/our-power-stations/wind","version":"Editorial grouping; see record evidence","publication_date":"","checked_on":"2026-10-02","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"dlf","title":"AEMO DLF FY2026–27","url":"https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/loss_factors_and_regional_boundaries/2026-27/distribution-loss-factors-for-the-2026---27-financial-year.xlsx?rev=9edeaaeca8b64400b453f40226f1a278&sc_lang=en","version":"Workbook version 1 · workbook date 2026-04-01","publication_date":"2026-03-31","checked_on":"2026-10-02","original_file_sha256":"5593f7623279f3b982981b21fed17419cef6930c07901e244ef46b1883aaac30","hash_note":"Retained original file bytes"},{"dataset":"dlf","title":"AEMO DLF FY2025–26","url":"https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/loss_factors_and_regional_boundaries/2025-26-marginal-loss-factors/distribution-loss-factors-for-the-2025-26-financial-year.xlsx?rev=4d130ef7a52f4d9ea8c30e92bdfe0dab&sc_lang=en","version":"Uploaded workbook; no version-control sheet","publication_date":"2025-04-14","checked_on":"2026-10-02","original_file_sha256":"802fe3700c266637b16003196a2cfe7d467169fad848e733ba1a9dbcffbab789","hash_note":"Retained original file bytes"},{"dataset":"green-qed","title":"AEMO Quarterly Energy Dynamics Q1 2026","url":"https://www.aemo.com.au/-/media/files/major-publications/qed/2026/qed-q1-2026.pdf?rev=0567011109cc484c80e0d82ea40df323&sc_lang=en","version":"Generation p.25; captured prices p.22","publication_date":"2026-04-30","checked_on":"2026-10-02T03:06:33.597Z","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"green-qed","title":"AEMO Quarterly Energy Dynamics Q2 2026","url":"https://www.aemo.com.au/-/media/files/major-publications/qed/2026/qed-q2-2026.pdf?rev=5cfa9aa6b7b6490ab22a13de588f9a66&sc_lang=en","version":"Generation p.25; captured prices p.23","publication_date":"2026-07-28","checked_on":"2026-10-02T03:06:33.597Z","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"green-qed","title":"AEMO Quarterly Energy Dynamics Q3 2025","url":"https://www.aemo.com.au/-/media/files/major-publications/qed/2025/qed-q3-2025.pdf?rev=7436be91333e4603bc59158b0bf095a1&sc_lang=en","version":"Generation p.23; captured prices p.20","publication_date":"2025-10-30","checked_on":"2026-10-02T03:06:33.597Z","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"green-qed","title":"AEMO Quarterly Energy Dynamics Q4 2025","url":"https://www.aemo.com.au/-/media/files/major-publications/qed/2025/qed-q4-2025.pdf?rev=b29ae0bd014c48f59a259009d246280f&sc_lang=en","version":"Generation p.22; captured prices p.20","publication_date":"2026-01-29","checked_on":"2026-10-02T03:06:33.597Z","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"negative-prices","title":"2025-10 NSW1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202510_NSW1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:51:08+00:00","original_file_sha256":"d0b438c469bff79b8a93d23c0ce87335f2b73159bebf41acfb7e722202e19303","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2025-10 QLD1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202510_QLD1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:51:07+00:00","original_file_sha256":"87622bf84a7993660bab5275d982e567eebef34224578d0c01cf04f58cf59f7b","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2025-10 VIC1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202510_VIC1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:51:07+00:00","original_file_sha256":"a15d7ba555eade7a0f776fdc90a57a6a058b5656ebd17b830101fb454a68f778","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2025-10 SA1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202510_SA1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:51:17+00:00","original_file_sha256":"39982a7c1311b2abdc30af1a685672865ab6faf08fceb2ce3fe95fa65773fcce","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2025-10 TAS1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202510_TAS1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:51:17+00:00","original_file_sha256":"c4b8db059795651b47babb81ee530373e5f7798fdaa7bd2a9d02ee40fb10c28c","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2025-11 NSW1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202511_NSW1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:51:17+00:00","original_file_sha256":"11ce9a97a9ec6748eabe9fe436e4f90245a3da1fd39fb445261a824bbbf20572","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2025-11 QLD1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202511_QLD1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:51:27+00:00","original_file_sha256":"8bf7a55dbfd5e626536ebe0434970b4a1f3788dc0448d4b033275a45cb3ff909","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2025-11 VIC1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202511_VIC1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:51:27+00:00","original_file_sha256":"fb3455870b61728066fe76701f4799ddf8a751fcfbd9a791815c49dba70ad846","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2025-11 SA1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202511_SA1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:51:27+00:00","original_file_sha256":"304233c73ef63fda203f8c17725b7c72c141911598831322653c1753f1cb7b9b","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2025-11 TAS1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202511_TAS1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:51:37+00:00","original_file_sha256":"bd3ed6259a5b61348a6409e4171d5b1e2303324f1ce9d22b12f6e7df08d16767","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2025-12 NSW1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202512_NSW1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:51:36+00:00","original_file_sha256":"d6c5968d4dda350edccc928c52b2dadc55a1df4aebfeb73cee7fa989a288565b","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2025-12 QLD1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202512_QLD1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:51:36+00:00","original_file_sha256":"bdae26a9a703708b3ab782cf1c9698674af5b1cf731440befa5994f698212362","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2025-12 VIC1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202512_VIC1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:51:46+00:00","original_file_sha256":"b017050c38eeac4ea03d20510449b7ca905a52496081af39d82f0f0181017f2a","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2025-12 SA1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202512_SA1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:51:46+00:00","original_file_sha256":"d050a82385d9c96e7b9f64c9591c616b80f520947488677fd7e309195835d8f5","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2025-12 TAS1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202512_TAS1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:51:46+00:00","original_file_sha256":"7daf5d457d4519090743e311e6c8aa82f08a3c41085a164eb25b9012a1e78667","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-01 NSW1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202601_NSW1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:51:55+00:00","original_file_sha256":"e925ec937ca6de5e79887519cfdb226c06917497ce8fd49062a8359b41924094","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-01 QLD1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202601_QLD1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:51:55+00:00","original_file_sha256":"a6ac8121aae0000255cb86fb5434de91dfbdbf197651d3b04e53e223ffc21eee","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-01 VIC1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202601_VIC1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:51:55+00:00","original_file_sha256":"29fef7e499d81f7fb4901aa36a7d17924ce15e4a24998a0b9143cffeee7b9387","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-01 SA1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202601_SA1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:52:05+00:00","original_file_sha256":"fb05f242250a9b1d0489ff698e74762509e7f954ea0ab1b59529e61ccd2bf97b","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-01 TAS1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202601_TAS1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:52:05+00:00","original_file_sha256":"fd1e7a6438caa282e4d7a43e3c546cc33520744c4d74ed41c7a0a6fe2dae93c0","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-02 NSW1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202602_NSW1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:52:05+00:00","original_file_sha256":"5ca85cec2a1fd6543f823268648639a873814b7254b2ecd8e94ce27b6b95dffb","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-02 QLD1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202602_QLD1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:52:15+00:00","original_file_sha256":"66214921c7dd74094047225af6b425713bc5748b383fb30f2c85a0caf87fd6b3","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-02 VIC1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202602_VIC1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:52:14+00:00","original_file_sha256":"30d2d46f4e35b9fd8d53ffe76d1ad06fee4435cf27a6cf490de26a26fcaedc62","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-02 SA1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202602_SA1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:52:15+00:00","original_file_sha256":"1a69f4246d34b88b4d04cc5830deee5870847b999a38b4887fc15dd16429519f","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-02 TAS1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202602_TAS1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:52:24+00:00","original_file_sha256":"7dee47a45ece9e6776b7173ffa7d0214f922393c25dc3aa976636b3d45d1ab09","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-03 NSW1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202603_NSW1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:52:24+00:00","original_file_sha256":"afd51413c510e8a3a5f4401d6c1fbaa769cfdf8a85bd3f1ab403cd9d3e6f058f","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-03 QLD1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202603_QLD1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:52:25+00:00","original_file_sha256":"67d9fc3f83def6ffc21aa7b9ae24a8f296bd598c0f1d4218ce5f8299d73987dd","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-03 VIC1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202603_VIC1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:52:33+00:00","original_file_sha256":"1b42b6874d1634e65ea57aeabc5022b62ef93c84287a95d4157b6f5e4301a84a","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-03 SA1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202603_SA1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:52:33+00:00","original_file_sha256":"2305685004793a3015dfbf3e670305609a4191c400a8d2783d35cbb82b0b7ac5","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-03 TAS1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202603_TAS1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:52:33+00:00","original_file_sha256":"7bf2e33078801fd1bc60a134711cd9a7f42ccebe5641b7699456ba422c79e8d2","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-04 NSW1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202604_NSW1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:52:42+00:00","original_file_sha256":"17a7ebf9c322f2df3e55f6b743bc4829efa30fb891f3dc84a1965f038f9b2f94","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-04 QLD1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202604_QLD1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:52:42+00:00","original_file_sha256":"1a7de6b8174176e8a903bb6a39f8586a09294d691fd9704d6f18b93a41780713","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-04 VIC1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202604_VIC1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:52:42+00:00","original_file_sha256":"92309966ddade1da2a20f934b3fa021f54ab5a438438ab8ecb1ca0b744936402","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-04 SA1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202604_SA1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:52:51+00:00","original_file_sha256":"206e7dbaf2517662a794524a2786287fcea561495488a2de0f78b117f43e9eff","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-04 TAS1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202604_TAS1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:52:51+00:00","original_file_sha256":"21e38ce9c254a78fccad15f5456e5d5843aa6a949ad59141077145347de02d17","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-05 NSW1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202605_NSW1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:52:51+00:00","original_file_sha256":"7bb653e074dd7d5f7dd1153d75bb3aa790c6890afc54e0c23773da120b4df0d0","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-05 QLD1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202605_QLD1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:53:01+00:00","original_file_sha256":"bde9ce3224a86b6a7ca2dc229eb4199b3256d8d3094e63f411271ee672f3212d","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-05 VIC1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202605_VIC1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:53:01+00:00","original_file_sha256":"6d3d37a983c6d07059fab4e83316cbacb11204a7bdf7af298ffa73c07a2998f7","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-05 SA1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202605_SA1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:53:01+00:00","original_file_sha256":"316bfb7d67d208befcad9bc8c3b35f97d361b266b0609c2ee27a7f8f5477555a","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-05 TAS1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202605_TAS1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:53:10+00:00","original_file_sha256":"d61b8ac497cd0dfc5f2658c317fe22386b98da9d1dcc215835980ef86c8bbdd7","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-06 NSW1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202606_NSW1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:53:10+00:00","original_file_sha256":"edcaaccc1871395f860ff4a1e0d6ae4db43302f6749d41a1e46f3ad30fc899e5","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-06 QLD1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202606_QLD1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:53:10+00:00","original_file_sha256":"007f61cb9781a28ec40ff422e1faa4679cddfee9fc8f84b169fe2447a1d21851","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-06 VIC1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202606_VIC1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:53:19+00:00","original_file_sha256":"7eb9a2d27718e87b582918321c3c0ec76bc4e720d83720efede650d0c10644b2","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-06 SA1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202606_SA1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:53:18+00:00","original_file_sha256":"bbf392b380e498bc135b3ab7684af4508aca3fdc555cadcf30065096b1b7efd8","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-06 TAS1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202606_TAS1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:53:19+00:00","original_file_sha256":"8aaf27860c4b06cc65fa31dd9c1b2c5bc5b74b5cfaf37beff814909996ac2cff","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-07 NSW1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202607_NSW1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:53:28+00:00","original_file_sha256":"562dfb1d4b89f752f969b106b74a7b876cdd8ed2b670d305145c4aa8e967df30","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-07 QLD1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202607_QLD1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:53:28+00:00","original_file_sha256":"56d5f951439b87c283b22cabcfa98dc59a68e374253aec2e80003c0af77c36ad","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-07 VIC1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202607_VIC1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:53:28+00:00","original_file_sha256":"06813047d73401243cb1e7b25f4df952eb22b56a7ec63047845efba4a38e42b0","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-07 SA1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202607_SA1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:53:37+00:00","original_file_sha256":"9fcb98786df2a3b903e624149872a9eec4b9bd909f4ef4176ff199aba5730f00","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-07 TAS1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202607_TAS1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:53:37+00:00","original_file_sha256":"406027aa7949a2f4e9db4bb13980faf9768dd71e286e9bcd97ea350aa087b38b","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-08 NSW1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202608_NSW1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:53:37+00:00","original_file_sha256":"3d2dfce2bc6df6e87276075176951ef3e4591b39d9c01f0e27928471a7053f63","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-08 QLD1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202608_QLD1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:53:46+00:00","original_file_sha256":"bd6af38296664cd7c6b79d2683b3b24db257400fc4eed85be04c6d3d27030e1a","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-08 VIC1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202608_VIC1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:53:46+00:00","original_file_sha256":"ece409eebd8b02d0a17ffd9433c93ecea099877d87aba2f31682c6969d32eb99","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-08 SA1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202608_SA1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:53:46+00:00","original_file_sha256":"b6da4ed479fd64718030818ecb2b67c0bfad015ce4096f98ba735ce8c825d82b","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-08 TAS1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202608_TAS1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:53:55+00:00","original_file_sha256":"d8cee73d57ee3e5cb223f03c03fab370f5bb4ef6829973c7beef831477174684","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-09 NSW1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202609_NSW1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:53:55+00:00","original_file_sha256":"85af3e1f68823c3eef87fcc98e5fa605c609b568ec64d6ef36b96722f8db8cd0","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-09 QLD1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202609_QLD1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:53:55+00:00","original_file_sha256":"e6ca24eee5c0d2eb3f5245efae43424db9df3e7991e7aad2eed010cffdada583","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-09 VIC1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202609_VIC1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:54:04+00:00","original_file_sha256":"7ba7307328b4bb2a79ebb3b38ad973b3b196aa067bf1e788f90ca1558ece772d","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-09 SA1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202609_SA1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:54:04+00:00","original_file_sha256":"7636b4dcb962678ca3b194de4ce8f8603eec3e1515696f9fd1651fb85773204b","hash_note":"Retained original file bytes"},{"dataset":"negative-prices","title":"2026-09 TAS1 TRADE interval prices","url":"https://visualisations.aemo.com.au/aemo/data/nem/priceanddemand/PRICE_AND_DEMAND_202609_TAS1.csv","version":"negative-time-v1","publication_date":"","checked_on":"2026-10-01T23:54:04+00:00","original_file_sha256":"9aa06426863955b9d4e124b39a975476620885c078b3a119d0d441a639448e12","hash_note":"Retained original file bytes"},{"dataset":"gas-prices","title":"AEMO Quarterly Energy Dynamics Q1 2026","url":"https://www.aemo.com.au/-/media/files/major-publications/qed/2026/qed-q1-2026.pdf?rev=0567011109cc484c80e0d82ea40df323&sc_lang=en","version":"p.50, Table 6","publication_date":"2026-04-30","checked_on":"2026-10-02","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"gas-prices","title":"AEMO Quarterly Energy Dynamics Q2 2026","url":"https://www.aemo.com.au/-/media/files/major-publications/qed/2026/qed-q2-2026.pdf?rev=5cfa9aa6b7b6490ab22a13de588f9a66&sc_lang=en","version":"p.50, Table 5","publication_date":"2026-07-28","checked_on":"2026-10-02","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"gas-prices","title":"AEMO Quarterly Energy Dynamics Q4 2025","url":"https://www.aemo.com.au/-/media/files/major-publications/qed/2025/qed-q4-2025.pdf?rev=b29ae0bd014c48f59a259009d246280f&sc_lang=en","version":"p.48, Table 7","publication_date":"2026-01-29","checked_on":"2026-10-02","original_file_sha256":"","hash_note":"Original-file hash unavailable; no original-byte verification claimed"},{"dataset":"gas-monthly","title":"DWGM Prices and Demand","url":"https://www.aemo.com.au/-/media/files/gas/dwgm/dwgm-prices-and-demand.xlsx?rev=653fe3042faa49758bfaa02a88ab2e64&sc_lang=en","version":"gas-monthly-daily-mean-v1","publication_date":"2026-09-07","checked_on":"2026-10-03","original_file_sha256":"31d87a9e8ef7137f0bf454ae4fd8871db2b42d82d62acf81156ea81dd5e52ad8","hash_note":"Retained original file bytes"},{"dataset":"gas-monthly","title":"STTM Price and Withdrawals","url":"https://www.aemo.com.au/-/media/files/gas/sttm/data/sttm-price-and-withdrawals.xlsx?rev=a6cb02f10d6a47949a59502a5b345e21&sc_lang=en","version":"gas-monthly-daily-mean-v1","publication_date":"2026-09-07","checked_on":"2026-10-03","original_file_sha256":"1e3fd6dfbc42954953388ac1c13b204e8cb9753370194d4d84744e2683f638aa","hash_note":"Retained original file bytes"}]}